Linking a design system puts its components and theme into your project, so the agent builds new screens from them. A project links one design system at a time.
  1. Open Project settings (the settings button next to the project name) and go to Design System.
  2. Find the design system under Organization Design Systems (released from your organization’s projects) or Public Design Systems (available to every project).
  3. Click Link Design. The project gets the design system’s newest release.
Only released design systems are listed. If there are none, the tab says No released design systems found. See Release a design system. You can also link one when you start a project: on the projects page, pick it in the design system menu of the generation input before you send your first prompt.
  • The design system’s components are copied into the project, and your code imports them from its import path.
  • The project uses the design system’s theme. Project settings > Theming is locked and says Design system’s theme is being used by the project. You can update the theme from the design system.
  • Every node on the canvas rebuilds with the new components and theme.
Linking, updating and unlinking apply to the branch you are on. See Branches.

Update to a newer release

When the design system has a newer release, its card shows New version available, and the Design System tab in Project settings shows a count.
  1. Click New version available.
  2. Polymet replaces the old components with the new release and says Design system updated successfully.
Updating always moves to the newest release.
  1. In Linked design system, open the menu on the design system’s card.
  2. Click Unlink.
Unlink is disabled while any file in your project still imports from the design system. Its tooltip says how many, for example This design system is used in 3 components. Remove these dependencies before unlinking. Open Usages below the card to see which files they are, change them, then unlink. Unlinking also waits for a running generation to finish.

Limits

  • One design system per project. To switch, unlink the current one first.
  • The project needs at least one version before it can link (Project needs to at least have one version to link to a design system).
  • Apart from the ones under Public Design Systems, you can only link design systems from your own organization.
  • A design system cannot link another design system.
  • Design systems — what a design system is and how to make one
  • Release a design system — make a new version available to linked projects
  • Themes — a project’s own colors and fonts, when no design system is linked